Sunshine Coast based. South East Queensland ready.A division of Exceed Concrete Construction · Established 1997 24/7 BOOKINGS
Night works traffic control with reflective hi-vis crew, portable lighting and an illuminated arrow board on a Queensland road
Safety & compliance

Safety is not a box to tick.

It is the foundation of every plan, every site setup and every shift. Clear responsibilities and practical checks keep the work moving safely.

Group management systems

Quality. Environment. People.

ISO 45001

Occupational health and safety systems that support risk management, worker consultation and a consistent safety approach.

ISO 9001

Quality management systems supporting documented processes, clear responsibilities and continual improvement.

ISO 14001

Environmental management systems supporting responsible planning and consideration of impacts around the worksite.

Equal Assurance confirms approved certification through 20 July 2029. ETG is named on the ISO 9001 and ISO 45001 certificates; ISO 14001 is held by Exceed Concrete Construction, with traffic management included in its scope. View the renewed certificates below.

Official Exceed documents

Certificates & company policies

Verified with Equal Assurance on 7 October 2026: certification is approved, with certificates dated 12 July 2026 and valid to 20 July 2029. ISO 9001 and ISO 45001 certificates below name Exceed Traffic Group Pty Ltd. The ISO 14001 certificate names Exceed Concrete Construction. All three scopes include traffic management services.

The Exceed website still carries older certificate scans; the PDFs below are the renewed versions retrieved directly from the issuer. Company policies are the original signed documents dated 14 June 2022. ISO certification is separate from TMR provider registration, which remains to be confirmed.

Current Equal Assurance ISO 9001 quality certificate for Exceed Traffic Group Pty Ltd, valid to 20 July 2029
ETG certificate · PDF

ISO 9001:2015

Exceed Traffic Group Pty Ltd · EXCQ01-CCCQ04-01

Valid to 20 July 2029 View original
Current Equal Assurance ISO 45001 workplace safety certificate for Exceed Traffic Group Pty Ltd, valid to 20 July 2029
ETG certificate · PDF

ISO 45001:2018

Exceed Traffic Group Pty Ltd · EXCQ01-CCWW04-01

Valid to 20 July 2029 View original
Current Equal Assurance ISO 14001 environmental certificate for Exceed Concrete Construction, valid to 20 July 2029
Exceed Concrete certificate · PDF

ISO 14001:2015

Exceed Concrete Construction · EXCQ01-CCEE04

Valid to 20 July 2029 View original
Exceed quality policy signed by Darren Ball on 14 June 2022
Published company policy

Quality policy

Exceed Concrete Constructions and Exceed Traffic Group

Signed 14 June 2022 View original
Exceed safety policy signed by Darren Ball on 14 June 2022
Published company policy

Safety policy

Worker consultation, risk control and public safety

Signed 14 June 2022 View original
Exceed environmental and sustainability policy signed by Darren Ball on 14 June 2022
Published company policy

Environmental & sustainability policy

Environmental obligations, resources and waste

Signed 14 June 2022 View original

Queensland traffic management requirements

Traffic arrangements are assessed against Queensland MUTCD Part 3, the Queensland Guide to Temporary Traffic Management (QGTTM, sometimes referred to as QGTM), and the road authority’s current requirements. The TMR Traffic Management Registration Scheme has specific requirements for registered providers and relevant work. Confirm the applicable registration evidence before procurement or mobilisation.

TMR registration number: [TO BE CONFIRMED BY ETG]
Registration number and current scope are awaiting owner confirmation. This field is not evidence of registration.

Training and role authorisation

Traffic control, traffic management implementation and traffic scheme design are different roles. Appropriate TMR-approved training and current authorisation must match the work being undertaken. RIIWHS302E, Implement traffic management plans, is part of the relevant implementer training pathway. Site-specific inductions and principal-contractor requirements may apply in addition.

Pre-starts and equipment checks

Review the approved scheme, actual site conditions, communications and responsibilities before the shift. Check the placement and condition of signs, cones, barriers and other devices. Discuss plant movements, delivery access and pedestrian routes. If the work changes, use the agreed review process rather than assuming the existing arrangement still fits.

Fatigue management and night works

Rosters need to consider shift length, breaks and travel, especially for night or extended work. Lighting must support the task without creating glare for road users. Clear shift handovers should identify current controls, changed hazards and the supervisor responsible for the next stage.

Incident reporting and improvement

Crews need a clear escalation contact for incidents, near misses and unsafe changes. Stop and review the work when the arrangement cannot protect the people affected. Record relevant observations and communicate changes through the project’s reporting process. Serious incidents must be managed under applicable statutory reporting requirements and the principal contractor’s procedures.

Let’s get your project moving.

Practical planning. Reliable crews. A safer site from the start.

Call 07 5449 8813Request a plan / quote