
AI-generated supporting illustration. Always check current authority requirements for your specific job.
There is no single price for every worksite
Traffic control costs depend on the job, not just the number of people visible beside the road. A short local delivery, a multi-stage arterial closure and an overnight utility repair have different risks and resource requirements. ETG prepares job-specific quotes rather than publishing an unsupported statewide hourly rate. A meaningful estimate starts with the location, scope and permitted work hours.
Crew numbers and shift coverage
The approved arrangement determines the operational roles and coverage required. Consider establishment, active work, breaks and removal of controls. The work may need an implementer as well as controllers. If a closure remains after construction crews leave, monitoring responsibilities must still be clear. Night shifts, weekends and urgent mobilisation can affect the commercial scope.
Planning, permits and equipment
TMP preparation and TGS design are distinct from on-site traffic control. Road authority assessment fees may be payable separately. VMS boards, portable signals, arrow boards and barriers have their own hire, transport and setup requirements. Ask whether delivery, relocation, battery maintenance and collection are included. Cheap-looking comparisons can leave out essential stages of the job.
Travel and site complexity
Travel distance, vehicle requirements and the number of daily site changes affect resources. Rural work can involve long establishment runs, while urban work may need constrained access and several pedestrian interfaces. A moving utility work front may need multiple schemes. Supply accurate details so the quote does not rely on an arrangement that the site cannot accommodate.
How to compare quotations fairly
Compare the documented scope, not just the headline rate. Check included hours, minimum engagement terms if quoted, travel, equipment, planning and any exclusions. Ask what happens if the work overruns or dates change. Do not assume a quoted rate covers permit revisions or additional devices. Clarify these matters before confirming the booking.
Prepare a useful quote request
Send the job address, proposed start date, duration, work hours and service required. Attach a site plan and any existing traffic drawings or conditions. Explain likely concrete deliveries, crane activities or road occupation. ETG can discuss the proposed coverage and provide a scope-based quote. For urgent requirements, phone 07 5449 8813; availability is confirmed case by case.
- TMR temporary traffic management standards
- TMR traffic controller accreditation
- Sunshine Coast Council road and footpath permit information
This guide is general information, not an approval or a site-specific traffic plan. Fees, requirements and conditions are determined by the relevant authority.
